FIBER + LOW VOLTAGE CREWS · DATA CENTER BUILDS
CREWS THAT SHOW UP.
Foreman-led fiber and low-voltage crews for hyperscale data center builds. On site in 7 to 10 days, on rotation through closeout. One rate, one invoice, one person to call.
7–10 DAYS
TYPICAL MOBILIZATION
21 / 7
STANDARD ROTATION
12 HR
SHIFTS, DAY OR NIGHT
1 DAY
TO A WRITTEN RATE
WHY WE EXIST
THE SCHEDULE DOESN'T MOVE. THE MANPOWER DOES.
A hyperscale data hall can take a hundred people on site every day. The scope gets done. Getting those people there, and keeping them there, is the hard part.
Here is how it usually goes. A contractor wins the cabling phase, then spends two weeks calling around for forty techs who can travel next Monday. Half of what an agency sends has never landed an MPO trunk. The good techs leave after one rotation because per diem came late or nobody told them where the next site is. Every new face on the floor means retraining, and that is where labeling mistakes and long punch lists come from.
Hardline exists to fix that part. A foreman who owns the crew, techs who stay through the rotation and the closeout, and one person who picks up the phone when something goes wrong.
WHAT WE DEPLOY
FIVE CREW TYPES, ONE LINE ITEM.
FIELD GUIDES
READ BEFORE YOU STAFF.
HOW AN ENGAGEMENT RUNS
TWENTY MINUTES TO SCOPE. ABOUT A WEEK TO SITE.
GENERAL LIABILITY AND WORKERS' COMP ON FILE
OSHA 10/30 · NFPA 70E · ARC FLASH AWARENESS
BACKGROUND CHECKS AND DRUG SCREENING ON REQUEST
CREWS SUPERVISED, INSURED AND PAID BY HARDLINE
Crews are supervised, insured and paid by Hardline. Certificates of insurance are issued before mobilization.
TELL US THE SCOPE. GET A RATE IN ONE BUSINESS DAY.
Send the scope, headcount and start date. We reply with a written rate and a mobilization window.